SUZHOU SHENHONG IMPORT AND EXPORT CO.,LTD

SUZHOU SHENHONG IMPORT AND EXPORT CO.,LTD Transmission Line Equipment,Cable Laying Equipment,Cable Pulling Tools To live by quality,To develop by prestige

Manufacturer from China
Site Member
9 Years
Home / Products / Tower Erection Tools /

LBNXG120-9 Tower Erection Tools 9 Meter Suspended Tubular Gin Pole 7.5Kg / M

Contact Now
SUZHOU SHENHONG IMPORT AND EXPORT CO.,LTD
Province/State:jiangsu
Country/Region:china
Contact Person:MsJudy
Contact Now

LBNXG120-9 Tower Erection Tools 9 Meter Suspended Tubular Gin Pole 7.5Kg / M

Ask Latest Price
Video Channel
Brand Name :SHENGHONG
Model Number :LBNXG120-9
Certification :ISO
Place of Origin :MADE IN CHINA
MOQ :1 set
Price :negotiation
Payment Terms :L/C, T/T, Western Union
Supply Ability :100sets/month
Delivery Time :15-20 days after payment
Packaging Details :export package
Item :Gin pole
Length :9m
Diamter :120mm
Load Capacity :9KN
Weight :7.5kg/m
Material :Aluminum
more
Contact Now

Add to Cart

Find Similar Videos
View Product Description

LBNXG120-9 Tower Erection Tools 9 Meter Suspended Tubular Gin Pole 7.5Kg / M​

Data Sheet

Item number Model Length(m)

Allowable axial

Direction load (kN)

Cross section(mm) Weight (kg/m)
03101 LBNXG120-9 9 9 φ120 7.5
03102 LBNXG120-10.5 10.5 6 φ120
03111 LBNXG150-9 9 15 φ150 8
03112 LBNXG150-10.5 10.5 11 φ150

Usage :

To assemble and erect the tower and pole in transmission and distribution construction.

Notes:

1. Use high strength aluminum alloy tube as main materials,steel parts are galvanized.

2. Including 2 sets waist loop

3. The safety factor is 1.5

LBNXG120-9 Tower Erection Tools 9 Meter Suspended Tubular Gin Pole 7.5Kg / M

Inquiry Cart 0